Search

Help

Page 2 of 7. Showing 69 results (0.017 seconds)

  1. Individual Student Results (ISR) Report

    The Individual Student Results (ISR) Report shows individual student performance across tests windows on tests assigned to a program. Site administrators can modify the Program Configuration https://support.assessment.pearson.com/x/RQUgBg at any time. If enabled, this report is available to roles with permission
    ADAM SupportDec 13, 2023
  2. Create Graphic Gap Match Items

    Graphic Gap Match. Under Configuration, upload an image and set its dimensions. You can enter alternate text in Image Alt Text. Use the sliders to adjust
    ADAM SupportJan 18, 2024
  3. _TN_DefaultSFTPrecommendInstallable

    TestNav has a default primary SRF save location for all computers and devices. For detailed information on saved response files (SRFs) and log files, see Understand SRFs and Log Files. SFTP configuration is not supported by all assessment management systems. Consult your assessment management system user guide
    Includes RepositoryAug 25, 2023
  4. Author Test Items

    for the item. You can add multiple rubrics to an item.  The selection options for Name, Status, Standards, and Metadata depend on bank configuration … be consistent and easy to search. The field is automatically populated with a default prefix based on the bank configuration. Status: The status
    ADAM SupportFeb 15, 2024
  5. Online Test Session Reports

    Configuration Organizations with a Precaching Server Configuration Organization Test Administration Filter Options: Organizations without Precaching Server Configuration, Organizations with Precaching Server Configuration Organization Name Organization Code Default- Configuration Name Default- Computer
  6. Configure TestNav for Proctor Caching

    Create TestNav configurations to identify the computer(s) for caching. These tasks are a prerequisite to online testing, if you use ProctorCache. You must … the proctor-caching computer's IP address and port. The default port is 4480. Step-by-Step  From Setup, select TestNav Configurations. ConfTNProctCac_1.png
  7. _TN_SRFandLogs_UnderstandTestNav

    SFTP Note: SFTP configuration is not supported by all assessment management systems. Consult your assessment management system user guide to determine
    Includes RepositoryFeb 14, 2024
  8. Program Report

    the Program Report button. AD_ProgSel.png You can configure the report in several ways. Available configuration options can vary, depending on your program
    ADAM SupportJan 05, 2024
  9. Performance Report

    enabled in Program Configuration. AD_Perform-Report_6.png At the top of the popup, you can select the arrows or item dropdown to view other items in the report … and the secondary objective may be Raw Score or Percent Correct.  Example of Performance Level as primary objective in Program Configuration (used in examples below
    ADAM SupportJan 05, 2024
  10. Create an Eligibility-Based Administration

    -by-Step Go to Test Management > Administrations. Select the Administer New button. Complete each configuration page. On the Students page, select Eligibility
    ADAM SupportJan 02, 2024