Page 21 of 27. Showing 268 results (0.01 seconds)
Define Bank Workflow
’ setting that can be selected in order to override all previous status of items being cloned. Remove Clone: WhenRe: Program Configuration
of points available on an assessment in terms of the meaningfulness of adding additional levels.Individual Student Report (ISR) Setup
for languages by version) using the Outcome Grade Label and Outcome Date Label fields. Additionally, apply logic to which gradeValidity Settings
independently of the other rules, in the order the rules are created. Once the Validity Rules are checked, determinedView Student Responses
. Either use the scroll bar or the navigation tools at the bottom to view additional items. Select Close to returnResults Explorer
(ISR), if enabled for the selected program. Use the page navigation in the top right to move to additionalSN QRC-Classroom Level Reporting_Standards Analysis_20.pdf
• Group standards performance by a specific standards level • Order standards by student performance • Limit the viewSN QRC_InstructionalMaterials_ApprovingInstructionalMaterials.pdf
or descending order Click and then Pin Left to tack the column to the left so that it stays visible when youManage or Modify Items
> Items. Select the Bank with the items you want to manage. Select additional filters to narrow your search if neededRe: Author Test Items
EBSR - Evidence Based Selected Response - The first part of the item (Accuracy) must be correct in order to evaluate and score the second part of the item (Evidence) Dichotimous - When there are two or more interactions (three